State Road 105 (Heckscher Drive) Resurfacing

Overview

A project to resurface approximately 2.5 miles of roadway along Heckscher Drive (State Road 105) from west of Busch Drive east to the Fuel Farm began in May 2019.

Contractor Preferred Materials Inc. is the contractor for the $3 million project. In addition to milling and resurfacing, construction activities will include base work, shoulder treatment, drainage improvements, curb and gutter repairs and highway signage replacement.

The existing posted speed limit of 45 miles per hour will remain in place throughout the project. Earthwork is expected to take place during daytime hours, while paving work may occur overnight as well as during the day. No lane closures will be permitted from 6:30 to 8:30 a.m. and 4 to 6 p.m. Monday through Friday. When lane closures are needed, drivers will be alerted in advance via portable, changeable message signs.

Traffic Impacts

No alerts at this time.

Project Photos

No photos at this time.

Project Documents

No documents at this time.
No Events at this time.

Project Details

Project Start:May 2019
Expected Completion:Early 2020
Cost:$3 million
Project #:4376151
RoadsState Road 105
CountiesDuval
CitiesJacksonville

Contact

Sara Pleasants
386-269-3490

State Road 105 (Heckscher Drive) Resurfacing

Overview

A project to resurface approximately 2.5 miles of roadway along Heckscher Drive (State Road 105) from west of Busch Drive east to the Fuel Farm began in May 2019.

Contractor Preferred Materials Inc. is the contractor for the $3 million project. In addition to milling and resurfacing, construction activities will include base work, shoulder treatment, drainage improvements, curb and gutter repairs and highway signage replacement.

The existing posted speed limit of 45 miles per hour will remain in place throughout the project. Earthwork is expected to take place during daytime hours, while paving work may occur overnight as well as during the day. No lane closures will be permitted from 6:30 to 8:30 a.m. and 4 to 6 p.m. Monday through Friday. When lane closures are needed, drivers will be alerted in advance via portable, changeable message signs.

Project Details

Project Start:May 2019
Expected Completion:Early 2020
Cost:$3 million
Project #:4376151
RoadsState Road 105
CountiesDuval
CitiesJacksonville

Contact

Sara Pleasants
386-269-3490
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable