For additional information on the current situation, please visit the alerts page. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train

Travel Updates Related to COVID-19 - Alerts  |  To renew a Florida driver license, ID card, tag, or title, visit GoRenew.com

Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train
Beach Boulevard (SR 212) from SR 115 to Eve Drive Improvements
Overview

Proposed improvements include:

  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on eastbound Beach Boulevard to northbound Southside Boulevard
  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on westbound Beach Boulevard to southbound Southside Boulevard
  • Construction of a stop-controlled median directional crossover on Beach Boulevard to Newell Boulevard
  • Construction of a signal-controlled median directional crossover on Beach Boulevard to W. Eve Drive
  • Widening Beach Boulevard to accommodate the MUTs and directional crossovers
  • Construction of traffic signals, pedestrian and bicycle facilities and driveway modifications
  • Installation of overhead and post-mounted signs and pavement markings
  • Milling and resurfacing within the project limits

A.M. Peak Comparison (Animation)
P.M. Peak Comparison (Animation)

Project Photos
No photos at this time.
Public Open House (Tuesday, September 10, 2019)

A public open house regarding proposed changes to the roadway, signalization, striping and medians on Beach Boulevard between Southside Boulevard (State Road 115) and Eve Drive will be held Tuesday, September 10 at the Regency Square Branch Library, 9900 Regency Square Boulevard, Jacksonville, FL 32225. Attendees will have the opportunity to view displays and discuss the proposed changes with project staff and consultants during an open house from 4 to 6 p.m. No formal presentation will be made.

Proposed improvements include:

  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on eastbound Beach Boulevard to northbound Southside Boulevard
  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on westbound Beach Boulevard to southbound Southside Boulevard
  • Construction of a stop-controlled median directional crossover on Beach Boulevard to Newell Boulevard
  • Construction of a signal-controlled median directional crossover on Beach Boulevard to W. Eve Drive
  • Widening Beach Boulevard to accommodate the MUTs and directional crossovers
  • Construction of traffic signals, pedestrian and bicycle facilities and driveway modifications
  • Installation of overhead and post-mounted signs and pavement markings
  • Milling and resurfacing within the project limits

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require accommodations under the Americans with Disabilities Act (ADA) or who require translation services (at no charge) should contact Sara Pleasants at least seven days in advance at (904) 831-3368 or sara.pleasants@dot.state.fl.us.

Access Management Hearing (Monday, April 1, 2019)

Meeting Location:
Regency Square Branch Library
9900 Regency Square Blvd.
Jacksonville, FL 32225

The Florida Department of Transportation is considering changes to Beach Boulevard that include construction of a Restricted Crossing U-Turn (RCUT) on Beach Blvd. to northbound Southside Blvd. and northbound Eve Drive; construction of a Displaced Left Turn (DLT) on Beach Blvd. to southbound Southside Blvd.; construction of a Bypass Right Turn Lane on Southside Blvd. to eastbound Beach Blvd.; median improvements and pedestrian facilities at the intersection of Patton Road and Southside Service Road; widening Beach Blvd. and Southside Blvd. to accommodate RCUT and DLT; construction of traffic signals, pedestrian and bicycle facilities and driveway modifications; installation of overhead and post-mounted signs and pavement markings; and milling and resurfacing within the project limits.

Project documents will be available for review at the public hearing and at www.nflroads.com by March 25, 2019. Persons wishing to submit written statements or other exhibits in place of or in addition to oral statements may do so at the hearing or by sending them to Peter Osborne, 2198 Edison Avenue, Jacksonville, Florida 32204. Exhibits or statements postmarked on or before April 11, 2019 will become part of the public record. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act (ADA) or persons who require translation services (free of charge) should contact Sara Pleasants at least seven days prior to the hearing at sara. pleasants@dot.state.fl.us or (904) 831-3368.

Drop by anytime between 4:30 and 6:30 p.m. to view displays and discuss proposed modifications with FDOT staff and project consultants. A public comment period will begin at 6:30 p.m. For more information, contact Peter Osborne at (904) 360-5608 or peter.osborne@dot.state.fl.us.

Project Details
Project Start:Summer 2021
Expected Completion:Fall 2022
Cost:$6 million
Project #:439368-1
RoadsState Road 115, State Road 212 (Beach Boulevard)
CountiesDuval
Cities
Contact
Photo of Sara PleasantsSara Pleasants
386-269-3490
Beach Boulevard (SR 212) from SR 115 to Eve Drive Improvements
Overview

Proposed improvements include:

  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on eastbound Beach Boulevard to northbound Southside Boulevard
  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on westbound Beach Boulevard to southbound Southside Boulevard
  • Construction of a stop-controlled median directional crossover on Beach Boulevard to Newell Boulevard
  • Construction of a signal-controlled median directional crossover on Beach Boulevard to W. Eve Drive
  • Widening Beach Boulevard to accommodate the MUTs and directional crossovers
  • Construction of traffic signals, pedestrian and bicycle facilities and driveway modifications
  • Installation of overhead and post-mounted signs and pavement markings
  • Milling and resurfacing within the project limits

A.M. Peak Comparison (Animation)
P.M. Peak Comparison (Animation)

Project Details
Project Start:Summer 2021
Expected Completion:Fall 2022
Cost:$6 million
Project #:439368-1
RoadsState Road 115, State Road 212 (Beach Boulevard)
CountiesDuval
Cities
Contact
Photo of Sara PleasantsSara Pleasants
386-269-3490
Events
Public Open House (Tuesday, September 10, 2019)

A public open house regarding proposed changes to the roadway, signalization, striping and medians on Beach Boulevard between Southside Boulevard (State Road 115) and Eve Drive will be held Tuesday, September 10 at the Regency Square Branch Library, 9900 Regency Square Boulevard, Jacksonville, FL 32225. Attendees will have the opportunity to view displays and discuss the proposed changes with project staff and consultants during an open house from 4 to 6 p.m. No formal presentation will be made.

Proposed improvements include:

  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on eastbound Beach Boulevard to northbound Southside Boulevard
  • Construction of a signal-controlled Median U-Turn Intersection (MUT) on westbound Beach Boulevard to southbound Southside Boulevard
  • Construction of a stop-controlled median directional crossover on Beach Boulevard to Newell Boulevard
  • Construction of a signal-controlled median directional crossover on Beach Boulevard to W. Eve Drive
  • Widening Beach Boulevard to accommodate the MUTs and directional crossovers
  • Construction of traffic signals, pedestrian and bicycle facilities and driveway modifications
  • Installation of overhead and post-mounted signs and pavement markings
  • Milling and resurfacing within the project limits

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require accommodations under the Americans with Disabilities Act (ADA) or who require translation services (at no charge) should contact Sara Pleasants at least seven days in advance at (904) 831-3368 or sara.pleasants@dot.state.fl.us.

Access Management Hearing (Monday, April 1, 2019)

Meeting Location:
Regency Square Branch Library
9900 Regency Square Blvd.
Jacksonville, FL 32225

The Florida Department of Transportation is considering changes to Beach Boulevard that include construction of a Restricted Crossing U-Turn (RCUT) on Beach Blvd. to northbound Southside Blvd. and northbound Eve Drive; construction of a Displaced Left Turn (DLT) on Beach Blvd. to southbound Southside Blvd.; construction of a Bypass Right Turn Lane on Southside Blvd. to eastbound Beach Blvd.; median improvements and pedestrian facilities at the intersection of Patton Road and Southside Service Road; widening Beach Blvd. and Southside Blvd. to accommodate RCUT and DLT; construction of traffic signals, pedestrian and bicycle facilities and driveway modifications; installation of overhead and post-mounted signs and pavement markings; and milling and resurfacing within the project limits.

Project documents will be available for review at the public hearing and at www.nflroads.com by March 25, 2019. Persons wishing to submit written statements or other exhibits in place of or in addition to oral statements may do so at the hearing or by sending them to Peter Osborne, 2198 Edison Avenue, Jacksonville, Florida 32204. Exhibits or statements postmarked on or before April 11, 2019 will become part of the public record. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act (ADA) or persons who require translation services (free of charge) should contact Sara Pleasants at least seven days prior to the hearing at sara. pleasants@dot.state.fl.us or (904) 831-3368.

Drop by anytime between 4:30 and 6:30 p.m. to view displays and discuss proposed modifications with FDOT staff and project consultants. A public comment period will begin at 6:30 p.m. For more information, contact Peter Osborne at (904) 360-5608 or peter.osborne@dot.state.fl.us.

 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable