The Southside Connector (State Road 113) over Arlington Expressway (State Road 10A) will undergo rehabilitation activities until the summer of 2019.
The rehabilitation project includes the coating of steel beams, minor concrete repairs, replacement of structural steel rivets and the replacement of expansion joints, which assist in protecting the bridge from movement.
Traffic will be maintained in accordance with FDOT design standards throughout the project. Drivers on the Southside Connector and Arlington Expressway can expect periodic single lane closures during off-peak driving hours. Lane closures may occur seven days a week from 7:30 p.m. to 7 a.m.
Seminole Equipment, Inc. will complete this $1.3 million improvement project in summer 2019, weather and unforeseen circumstances permitting.
The Florida Department of Transportation urges motorists to always follow the speed limit and stay within the limits of orange cones and barrels while traveling through construction zones. For up-to-date information regarding construction projects and lane closures, please visit www.nflroads.com or contact FDOT personnel at 904-831-FDOT.