U.S. 1 (State Road 5) from Fairbanks Street to Big Oak Road safety improvement project

Overview

The Florida Department of Transportation (FDOT) is scheduled to let a safety improvement project on State Road 5/U.S. 1 from north of Fairbanks Street to Big Oak Road (3 miles) in December 2019. The safety improvements will include sidewalk installation on both sides of U.S. 1 from Fairbanks Street to the Northrup Grumman entrance. Sidewalk will only be installed on the west side of U.S. 1 from the Northrup Grumman entrance to Big Oak Road. Other incidental construction items such as curb and gutter work will also be included in the safety project.

Traffic Impacts

No alerts at this time.

Project Photos

No photos at this time.

Project Documents

No documents at this time.
No Events at this time.

Project Details

Project Start:Early 2020
Expected Completion:Late 2020
Cost:$3.4 million
Project #:436023-1
RoadsState Road 5, U.S. 1
CountiesSt. Johns
CitiesSt. Augustine

Contact

Bianca Speights
904-360-5471

U.S. 1 (State Road 5) from Fairbanks Street to Big Oak Road safety improvement project

Overview

The Florida Department of Transportation (FDOT) is scheduled to let a safety improvement project on State Road 5/U.S. 1 from north of Fairbanks Street to Big Oak Road (3 miles) in December 2019. The safety improvements will include sidewalk installation on both sides of U.S. 1 from Fairbanks Street to the Northrup Grumman entrance. Sidewalk will only be installed on the west side of U.S. 1 from the Northrup Grumman entrance to Big Oak Road. Other incidental construction items such as curb and gutter work will also be included in the safety project.

Project Details

Project Start:Early 2020
Expected Completion:Late 2020
Cost:$3.4 million
Project #:436023-1
RoadsState Road 5, U.S. 1
CountiesSt. Johns
CitiesSt. Augustine

Contact

Bianca Speights
904-360-5471
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable