Resurfacing Improvements on I-295 (SR 9A) from Trout River to Biscayne Boulevard

Overview

This project includes resurfacing the roadway on I-295 (SR 9A) from Trout River to east of Biscayne Boulevard overpasses. The construction work includes:

  • Milling and paving of the roadway and ramps within the project limits
  • Roadway striping
  • Guardrail installation
  • Drainage improvements
  • Other miscellaneous guardrail improvements

To improve safety, a high friction asphalt mixture will be used to pave a portion of the roadway of the southbound Dunn Avenue entrance ramp loop. This special mixture of asphalt, will allow tires to grip the roadway better for motorists while merging on to the interstate.

To complete paving operations, lane closures will be allowed on I-295 Sunday through Thursday from 9 p.m. to 5 a.m. No closures are permitted from 5 a.m. Friday to 9 p.m. Sunday.

Lane closure times on Dunn Avenue (S.R. 104), Lem Turner Road (S.R. 115) and Duval Road (S.R. 243) will vary. Detours will also be implemented to complete resurfacing and guardrail installation at the on and off ramps of I-295 within the project limits.

Duval asphalt Products Inc., was selected to complete the improvements

Traffic Impacts

No alerts at this time.

Project Photos

No photos at this time.

Project Documents

No documents at this time.
No Events at this time.

Project Details

Project Start:Late May 2018
Expected Completion:Summer 2019
Cost:$9.1 million
Project #:428807-1
RoadsState Road 9A
CountiesDuval
CitiesJacksonville

Contact

Bianca Speights
904-360-5471

Resurfacing Improvements on I-295 (SR 9A) from Trout River to Biscayne Boulevard

Overview

This project includes resurfacing the roadway on I-295 (SR 9A) from Trout River to east of Biscayne Boulevard overpasses. The construction work includes:

  • Milling and paving of the roadway and ramps within the project limits
  • Roadway striping
  • Guardrail installation
  • Drainage improvements
  • Other miscellaneous guardrail improvements

To improve safety, a high friction asphalt mixture will be used to pave a portion of the roadway of the southbound Dunn Avenue entrance ramp loop. This special mixture of asphalt, will allow tires to grip the roadway better for motorists while merging on to the interstate.

To complete paving operations, lane closures will be allowed on I-295 Sunday through Thursday from 9 p.m. to 5 a.m. No closures are permitted from 5 a.m. Friday to 9 p.m. Sunday.

Lane closure times on Dunn Avenue (S.R. 104), Lem Turner Road (S.R. 115) and Duval Road (S.R. 243) will vary. Detours will also be implemented to complete resurfacing and guardrail installation at the on and off ramps of I-295 within the project limits.

Duval asphalt Products Inc., was selected to complete the improvements

Project Details

Project Start:Late May 2018
Expected Completion:Summer 2019
Cost:$9.1 million
Project #:428807-1
RoadsState Road 9A
CountiesDuval
CitiesJacksonville

Contact

Bianca Speights
904-360-5471
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)