For additional information on the current situation, please visit the alerts page. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train
Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train
Arlington Expressway (SR 10A) from Southside Connector (SR 113) to University Boulevard proposed roundabout
Overview

The Florida Department of Transportation (FDOT) is currently conducting a Project Development & Environment (PD&E) Study on SR 10A (Arlington Expressway) from SR 113 (Southside Connector to University Boulevard located in Duval County, Florida (Financial Management Number 430718-2).

This project aims to improve intersection operations, safety and pedestrian facilities. FDOT is proposing to construct a single-lane roundabout at the interchange of Arlington Expressway and University Boulevard, which would include new crosswalks and pedestrian connections at the University Boulevard interchange area.

Median Improvements on Arlington Expressway
The project proposes to reconstruct the median barrier to close existing gaps and discourage pedestrians from crossing SR 10A (Arlington Expressway). The median project runs from the Mathews Bridge to SR 113 (Southside Connector).

Project Map that shows the length of the project where median barrier closures will occur along the Arlington Expressway from the Mathews Bridge to the Southside Connector

New Roundabout on University Boulevard
The proposed roundabout would be located at the north side of Arlington Expressway with its intersection with University Boulevard. This will mirror the existing roundabout on the south side of Arlington Expressway and University Boulevard.

Project Map that shows where the roundabout will be constructed on an overall map of Jacksonville along with an larger image showing what the roundabout will look like once constructed.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. § 327 and a Memorandum of Understanding dated May 26, 2022, and executed by the Florida Highway Administration (FHWA) and FDOT.

Project Photos
No photos at this time.
Project Documents
No documents at this time.
Hybrid Public Meeting (Online) (Tuesday, December 1, 2026)

The Florida Department of Transportation (FDOT) District 2 invites you to the Hybrid Public Meeting for the SR 10A (Arlington Expressway) from SR 113 (Southside Connector) to University Boulevard Project Development & Environment (PD&E) Study in Duval County, Florida (Financial Management Number 430718-2). This meeting will inform the public of the proposed improvements and serves as an official forum providing an opportunity for the public to express their opinions and concerns regarding the proposed access management changes.

Register Here: https://www.zoomgov.com/webinar/register/WN_5OJXuta9RGi53Se2cpr3Vw
Webinar ID: 165 600 9401
Passcode: 909674

Open House: 5:30-6 p.m.

Presentation & Public Comment Period: 6 p.m.

While comments about the project are accepted at any time, please note that comments must be received by December 14, 2026, to be included in the public meeting record.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities At, or persons who require translation services (free of charge) should contact Project Manager Jared Sweat at the number provided at least seven (7) days prior to the meeting.

Hybrid Public Meeting (In Person) (Thursday, December 3, 2026)

The Florida Department of Transportation (FDOT) District 2 invites you to the Hybrid Public Meeting for the SR 10A (Arlington Expressway) from SR 113 (Southside Connector) to University Boulevard Project Development & Environment (PD&E) Study in Duval County, Florida (Financial Management Number 430718-2). This meeting will inform the public of the proposed improvements and serves as an official forum providing an opportunity for the public to express their opinions and concerns regarding the proposed access management changes.

Where:Jacksonville University
2800 University Blvd North, Jacksonville, FL 32211
Davis College of Business & Technology
Multipurpose Conference Rooms 171 & 174

Open House: 4:30-6 p.m.

Presentation & Public Comment Period: 6 p.m.

While comments about the project are accepted at any time, please note that comments must be received by December 14, 2026, to be included in the public meeting record.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities At, or persons who require translation services (free of charge) should contact Project Manager Jared Sweat at the number provided at least seven (7) days prior to the meeting.

Project Details
Project Start:TBD
Expected Completion:TBD
Cost:TBD
Project #:430718-2
RoadsState Road 10A, State Road 113
CountiesDuval
CitiesJacksonville
Contact
Photo of Jared SweatJared Sweat

386-961-7462
Arlington Expressway (SR 10A) from Southside Connector (SR 113) to University Boulevard proposed roundabout
Overview

The Florida Department of Transportation (FDOT) is currently conducting a Project Development & Environment (PD&E) Study on SR 10A (Arlington Expressway) from SR 113 (Southside Connector to University Boulevard located in Duval County, Florida (Financial Management Number 430718-2).

This project aims to improve intersection operations, safety and pedestrian facilities. FDOT is proposing to construct a single-lane roundabout at the interchange of Arlington Expressway and University Boulevard, which would include new crosswalks and pedestrian connections at the University Boulevard interchange area.

Median Improvements on Arlington Expressway
The project proposes to reconstruct the median barrier to close existing gaps and discourage pedestrians from crossing SR 10A (Arlington Expressway). The median project runs from the Mathews Bridge to SR 113 (Southside Connector).

Project Map that shows the length of the project where median barrier closures will occur along the Arlington Expressway from the Mathews Bridge to the Southside Connector

New Roundabout on University Boulevard
The proposed roundabout would be located at the north side of Arlington Expressway with its intersection with University Boulevard. This will mirror the existing roundabout on the south side of Arlington Expressway and University Boulevard.

Project Map that shows where the roundabout will be constructed on an overall map of Jacksonville along with an larger image showing what the roundabout will look like once constructed.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. § 327 and a Memorandum of Understanding dated May 26, 2022, and executed by the Florida Highway Administration (FHWA) and FDOT.

Project Details
Project Start:TBD
Expected Completion:TBD
Cost:TBD
Project #:430718-2
RoadsState Road 10A, State Road 113
CountiesDuval
CitiesJacksonville
Contact
Photo of Jared SweatJared Sweat

386-961-7462
Events
Hybrid Public Meeting (Online) (Tuesday, December 1, 2026)

The Florida Department of Transportation (FDOT) District 2 invites you to the Hybrid Public Meeting for the SR 10A (Arlington Expressway) from SR 113 (Southside Connector) to University Boulevard Project Development & Environment (PD&E) Study in Duval County, Florida (Financial Management Number 430718-2). This meeting will inform the public of the proposed improvements and serves as an official forum providing an opportunity for the public to express their opinions and concerns regarding the proposed access management changes.

Register Here: https://www.zoomgov.com/webinar/register/WN_5OJXuta9RGi53Se2cpr3Vw
Webinar ID: 165 600 9401
Passcode: 909674

Open House: 5:30-6 p.m.

Presentation & Public Comment Period: 6 p.m.

While comments about the project are accepted at any time, please note that comments must be received by December 14, 2026, to be included in the public meeting record.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities At, or persons who require translation services (free of charge) should contact Project Manager Jared Sweat at the number provided at least seven (7) days prior to the meeting.

Hybrid Public Meeting (In Person) (Thursday, December 3, 2026)

The Florida Department of Transportation (FDOT) District 2 invites you to the Hybrid Public Meeting for the SR 10A (Arlington Expressway) from SR 113 (Southside Connector) to University Boulevard Project Development & Environment (PD&E) Study in Duval County, Florida (Financial Management Number 430718-2). This meeting will inform the public of the proposed improvements and serves as an official forum providing an opportunity for the public to express their opinions and concerns regarding the proposed access management changes.

Where:Jacksonville University
2800 University Blvd North, Jacksonville, FL 32211
Davis College of Business & Technology
Multipurpose Conference Rooms 171 & 174

Open House: 4:30-6 p.m.

Presentation & Public Comment Period: 6 p.m.

While comments about the project are accepted at any time, please note that comments must be received by December 14, 2026, to be included in the public meeting record.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities At, or persons who require translation services (free of charge) should contact Project Manager Jared Sweat at the number provided at least seven (7) days prior to the meeting.

 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable