The First Coast Expressway (FCE, SR 23) is a multi-lane, limited access toll road that, once completed, will cross parts of Duval, Clay and St. Johns counties. Expressway traffic will pass through electronic toll gantries without stopping. The gantries will contain an electronic system that will either detect the vehicle's SunPass transponder device or scan the vehicle's license plate for a toll-by-plate invoice in the mail. The total length of the proposed roadway is approximately 46 miles. The FCE will reduce congestion on other major roadways in the region, important not only for daily commuters but also critically important during times of storm-related evacuation.

Toll collection on the First Coast Expressway began in July 2019.

For questions or information regarding SunPass transponder registration, SunPass accounts or toll invoices, please contact SunPass at SunPass.com or 1-888-865-5352.

Construction on the northwestern, first segment of the FCE (Blanding Boulevard/SR 21 in Clay County north to I-10/US 90 in Duval County) began in 2013 and was completed in summer 2019, with toll collection beginning July 13, 2019.

The central, second segment of the FCE project involves new roadway from Blanding Boulevard/SR 21 in Middleburg running south and then east through Green Cove Springs and includes a new bridge over Black Creek near the Byron Road/Lake Asbury community.

The second segment is being divided into two separate projects:

  • The north project (FIN 422938-6), which runs from north of SR 16 to north of SR 21, will be built by Sacyr Construction at a cost of $230 million. Construction began in March 2019 and is expected to be completed in 2025, weather and schedule permitting.
  • The south project (FIN 422938-5), which runs from east of CR 209 to north of SR 16, will be built by Superior Construction at a cost of $180 million. Construction began in April 2019 and is expected to be completed in 2025, weather and schedule permitting.

The third segment of the FCE consists of:

  • A new bridge over the St. Johns River just south of the existing Shands Bridge (FIN 422938-7), beginning construction in 2023 and estimated for completion in 2030 at a cost of approximately $595 million.
  • New roadway from east of the County Road 16A Spur to I-95 in St. Johns County (FIN 422938-8), with a final construction start date to be determined and completion estimated in 2030.

Contact

Photo of Sara PleasantsSara Pleasants
386-269-3490
View FCE Map with Tolls

Sunpass Logo
View more information on being a SunPass user
FCE Segment 1 Completion Date
FCE South Project (Blanding Blvd to North of Argyle Blvd.) Summer 2019
FCE North Project (North of Argyle Blvd. to I-10) Summer 2019
FCE Extension Project (I-10 to Beaver Street/US 90) Summer 2018

FCE Segment 2 Start Date Est. Completion Date
FCE North (Blanding Blvd. in Middleburg to North of SR 16 in Green Cove Springs) March 2019 2025
FCE South (North of SR 16 to South of U.S. 17 by river in Green Cove Springs) April 2019 2025

FCE Segment 3 Est. Start Date Est. Completion Date
New bridge over St. Johns River Early 2023 2030
New roadway from east of the County Road 16A Spur to County Road 2209 in St. Johns County Late 2024 Early 2029
New roadway from County Road 2209 to I-95 in St. Johns County Fall 2025 Late 2031
What is a limited access highway?
A limited access highway only allows the public and motorist access to the roadway at interchanges with entrance and exit ramps.
What portion of the roadway will be tolled?
Signs stating Future Toll Road SR 23 have been placed on SR 23 (Branan Field-Chaffee Road / Cecil Commerce Center Parkway) to inform the public of the Florida Department of Transportation's (FDOT) plans to toll this section of roadway in the future. This roadway is part of a planned larger expressway project known as the First Coast Expressway (FCE). The FCE will be a toll facility from I-95 in St. Johns County to I-10 in Duval County. The mainline of the FCE will be tolled; however, the existing road from SR 21 to Oakleaf Plantation Parkway will become a non-tolled frontage road. Tolling this new facility will allow the project to be built much sooner.
When will tolls start being collected?
Toll collection will begin July 13, 2019.
Won't tolls cause congestion? Will I have to stop to pay a toll?

The Toll-23 (first portion of the First Coast Expressway) corridor will not have conventional toll collection plazas. There will be no stopping or slowing to pay tolls. All toll collection will be electronic, using the state's prepaid SunPass service or a license plate photo option called TOLL-BY-PLATE. SunPass reader equipment will be mounted overhead on structures spanning over the highway lanes. There will be one of these automated tolling facilities between each pair of interchange access points. For those vehicles equipped with SunPass, their toll amount will be automatically deducted from their prepaid account when they pass under the SunPass reader equipment at normal highway speeds.

For vehicles without SunPass, special camera equipment on the overhead gantries will record a photo of the license plate and a monthly invoice will be sent to the registered owner of the vehicle, including a $2.50 monthly administration fee.

What is the toll rate?
Under what circumstances could these toll rates be raised?
Toll rates will be adjusted annually for inflation, using the Consumer Price Index. This is in keeping with a 2007 law passed by the Florida Legislature.
Can I get a discount on the toll if I am a frequent traveler?
At present, there is no plan for a frequent user discount. However, SunPass toll rates will be approximately 25 percent lower than TOLL-BY-PLATE.
What are the free routes which motorists can use to avoid paying tolls?

Branan Field Road, OakLeaf Plantation Parkway, Old Middleburg Road, Chaffee Road and I-295 will all remain as free parallel north/south corridors.

Once tolls are in place, the trip from I-10 to New World Avenue and reverse will be toll free. This allows access to Cecil Commerce Center from I-10 without paying a toll. Also, between Old Jennings Road and Oakleaf Plantation Parkway, frontage roads have been constructed to maintain local access. These frontage roads are not tolled.

Where is the money coming from to build this road?
The entire project, except the frontage roads, will be funded by the Florida Turnpike Enterprise.
How does the toll bonding/construction cost funding system work?
The Florida Turnpike Enterprise borrows money with the toll revenues from this project as well as the entire Turnpike system as collateral for repayment of the debt. Due to Florida Turnpike Enterprise's excellent record of delivering toll projects, the interest rate on the debt is very low.
About

Construction on the northwestern, first segment of the FCE (Blanding Boulevard/SR 21 in Clay County north to I-10/US 90 in Duval County) began in 2013 and was completed in summer 2019, with toll collection beginning July 13, 2019.

The central, second segment of the FCE project involves new roadway from Blanding Boulevard/SR 21 in Middleburg running south and then east through Green Cove Springs and includes a new bridge over Black Creek near the Byron Road/Lake Asbury community.

The second segment is being divided into two separate projects:

  • The north project (FIN 422938-6), which runs from north of SR 16 to north of SR 21, will be built by Sacyr Construction at a cost of $230 million. Construction began in March 2019 and is expected to be completed in 2025, weather and schedule permitting.
  • The south project (FIN 422938-5), which runs from east of CR 209 to north of SR 16, will be built by Superior Construction at a cost of $180 million. Construction began in April 2019 and is expected to be completed in 2025, weather and schedule permitting.

The third segment of the FCE consists of:

  • A new bridge over the St. Johns River just south of the existing Shands Bridge (FIN 422938-7), beginning construction in 2023 and estimated for completion in 2030 at a cost of approximately $595 million.
  • New roadway from east of the County Road 16A Spur to I-95 in St. Johns County (FIN 422938-8), with a final construction start date to be determined and completion estimated in 2030.

Contact

Photo of Sara PleasantsSara Pleasants
386-269-3490
View FCE Map with Tolls

Sunpass Logo
View more information on being a SunPass user
Schedule
FCE Segment 1 Completion Date
FCE South Project (Blanding Blvd to North of Argyle Blvd.) Summer 2019
FCE North Project (North of Argyle Blvd. to I-10) Summer 2019
FCE Extension Project (I-10 to Beaver Street/US 90) Summer 2018

FCE Segment 2 Start Date Est. Completion Date
FCE North (Blanding Blvd. in Middleburg to North of SR 16 in Green Cove Springs) March 2019 2025
FCE South (North of SR 16 to South of U.S. 17 by river in Green Cove Springs) April 2019 2025

FCE Segment 3 Est. Start Date Est. Completion Date
New bridge over St. Johns River Early 2023 2030
New roadway from east of the County Road 16A Spur to County Road 2209 in St. Johns County Late 2024 Early 2029
New roadway from County Road 2209 to I-95 in St. Johns County Fall 2025 Late 2031
FAQ
What is a limited access highway?
A limited access highway only allows the public and motorist access to the roadway at interchanges with entrance and exit ramps.
What portion of the roadway will be tolled?
Signs stating Future Toll Road SR 23 have been placed on SR 23 (Branan Field-Chaffee Road / Cecil Commerce Center Parkway) to inform the public of the Florida Department of Transportation's (FDOT) plans to toll this section of roadway in the future. This roadway is part of a planned larger expressway project known as the First Coast Expressway (FCE). The FCE will be a toll facility from I-95 in St. Johns County to I-10 in Duval County. The mainline of the FCE will be tolled; however, the existing road from SR 21 to Oakleaf Plantation Parkway will become a non-tolled frontage road. Tolling this new facility will allow the project to be built much sooner.
When will tolls start being collected?
Toll collection will begin early 2019.
Won't tolls cause Congestion? Will I have to stop to pay a toll?

The Toll-23 (first portion of the First Coast Expressway) corridor will not have conventional toll collection plazas. There will be no stopping or slowing to pay tolls. All toll collection will be electronic, using the state's prepaid SunPass service or a license plate photo option called TOLL-BY-PLATE. SunPass reader equipment will be mounted overhead on structures spanning over the highway lanes. There will be one of these automated tolling facilities between each pair of interchange access points. For those vehicles equipped with SunPass, their toll amount will be automatically deducted from their prepaid account when they pass under the SunPass reader equipment at normal highway speeds.

For vehicles without SunPass, special camera equipment on the overhead gantries will record a photo of the license plate and a monthly invoice will be sent to the registered owner of the vehicle, including a $2.50 monthly administration fee.

What will the toll be?

The opening day tolls are estimated as follows:

Toll Rates for SunPass and TOLL-BY-PLATE
SunPass Rate TOLL-BY-PLATE Rate
2 axle 3 axle 4 axle 5 axle Add'l axles 2 axle 3 axle 4 axle 5 axle Add'l axles
PLAZA (Between New World Avenue and Normandy Boulevard)
$0.20 $0.40 $0.60 $0.80 $0.20 $0.45 $0.90 $1.35 $1.80 $0.45
PLAZA (Between Normandy Boulevard and 103rd Street)
$0.20 $0.40 $0.60 $0.80 $0.20 $0.45 $0.90 $1.35 $1.80 $0.45
PLAZA (Between 103rd Street and Argyle Forest Boulevard)
$0.60 $1.20 $1.80 $2.40 $0.60 $0.85 $1.70 $2.55 $3.40 $0.85
PLAZA (Between Argyle Forest Boulevard and Oakleaf Plantation Parkway)
$0.60 $1.20 $1.80 $2.40 $0.60 $0.85 $1.70 $2.55 $3.40 $0.85
PLAZA (Between Oakleaf Plantation Parkway and Blanding Boulevard)
$0.60 $1.20 $1.80 $2.40 $0.60 $0.85 $1.70 $2.55 $3.40 $0.85

View FCE Map with Tolls
View more information on being a SunPass user
Sunpass Logo
Under what circumstances could these toll rates be raised?
Toll rates will be adjusted annually for inflation, using the Consumer Price Index. This is in keeping with a 2007 law passed by the Florida Legislature.
Can I get a discount on the toll if I am a frequent traveler?
At present, there is no plan for a frequent user discount. However, SunPass toll rates will be approximately 25 percent lower than TOLL-BY-PLATE.
What are the free routes which motorists can use to avoid paying tolls?

Branan Field Road, OakLeaf Plantation Parkway, Old Middleburg Road, Chaffee Road and I-295 will all remain as free parallel north/south corridors.

Once tolls are in place, the trip from I-10 to New World Avenue and reverse will be toll free. This allows access to Cecil Commerce Center from I-10 without paying a toll. Also, between Old Jennings Road and Oakleaf Plantation Parkway, frontage roads have been constructed to maintain local access. These frontage roads are not tolled.

Where is the money coming from to build this road?
The entire project, except the frontage roads, will be funded by the Florida Turnpike Enterprise.
How does the toll bonding/construction cost funding system work?
The Florida Turnpike Enterprise borrows money with the toll revenues from this project as well as the entire Turnpike system as collateral for repayment of the debt. Due to Florida Turnpike Enterprise's excellent record of delivering toll projects, the interest rate on the debt is very low.
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)