N. Main Street (U.S. 17/State Road 5) from North of the Trout River Bridge to North of Busch Drive resurfacing
Overview

Preferred Materials Inc. was selected to complete this $4.9 million project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal and highway signing installation, guardrail work, sidewalk and bicycle path work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 8 a.m. to 1 p.m. on Sundays and from 5:30 p.m. to 10 p.m. within 600 feet of a signalized intersection.

Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:Spring 2026
Expected Completion:Early 2027
Cost:$4.9 million
Project #:209137-6
RoadsState Road 104, State Road 5, U.S. 17
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
N. Main Street (U.S. 17/State Road 5) from North of the Trout River Bridge to North of Busch Drive resurfacing
Overview

Preferred Materials Inc. was selected to complete this $4.9 million project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal and highway signing installation, guardrail work, sidewalk and bicycle path work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 8 a.m. to 1 p.m. on Sundays and from 5:30 p.m. to 10 p.m. within 600 feet of a signalized intersection.

Project Details
Project Start:Spring 2026
Expected Completion:Early 2027
Cost:$4.9 million
Project #:209137-6
RoadsState Road 104, State Road 5, U.S. 17
CountiesDuval
CitiesJacksonville
Contact
Photo of Brie IsomBrie Isom
904-360-5457
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable