Preferred Materials Inc. was selected to complete this $4.9 million project, which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal and highway signing installation, guardrail work, sidewalk and bicycle path work, and other incidental construction.
Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 8 a.m. to 1 p.m. on Sundays and from 5:30 p.m. to 10 p.m. within 600 feet of a signalized intersection.