For additional information on the current situation, please visit the alerts page. FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train
Florida Department of
TRANSPORTATION
Safety, Innovation, Mobility, Attract, Retain & Train
U.S. 1 from Moultrie Creek to North of State Road 207 resurfacing
Overview

Halifax Paving, Inc. was selected to complete this project which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk and bicycle path work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 7 a.m. to 7:30 p.m. Monday through Sunday. No lane closures will be allowed from 6:30 a.m. to 9 p.m. within 600 feet of a signalized intersection Monday through Sunday.

Project Photos
No photos at this time.
Subsequent Access Management Hybrid Public Meeting (Thursday, January 9, 2025)

Virtual Construction Open House and Public Meeting

A virtual construction open house and public meeting will be held on Thursday, January 9, 2025. Staff and consultants will be available from 4:30 p.m. to 6:00 p.m. (Eastern Time) to answer questions and accept comments related to the proposed improvements. A formal presentation and public comment period will begin at 6:00 p.m.

Virtual Meeting Registration: Register via GoTo Webinar

In-Person Construction Open House and Public Meeting

An in-person construction open house and public meeting will also be held on Thursday, January 9, 2025, at the St. Johns County Public Library Main Branch, located at 1960 N. Ponce De Leon Blvd., St. Augustine, FL 32084. Staff and consultants will be available from 4:00 p.m. to 6:00 p.m. (Eastern Time) to answer questions and accept comments related to the proposed improvements. A formal presentation and public comment period will begin at 6:00 p.m.

In-person and Virtual Public Meeting (Thursday, June 20, 2024)

The Florida Department of Transportation (FDOT) District Two invites you to the Public Meeting to provide input on the proposed median modification at U.S. 1 and Marion Street. The purpose of this meeting is to inform the public of the proposed median modification and provide an opportunity for the public to provide feedback. There are multiple opportunities to participate in the project feedback, including a virtual/online option and an in-person option. All participants, regardless of the platform they choose, will receive the same information on the proposed project and all comments received in-person, virtually or electronically, will be given equal weight.

Meeting Location:
St. Johns County Public Library System Main Branch Library
1960 N Ponce De Leon Boulevard, St. Augustine, FL.

Open House: 4:30 p.m. to 6 p.m.
Presentation and Public Comment Period: 6 p.m.
Virtual Registration: https://register.gotowebinar.com/register/4157009811792784728

After reviewing the meeting materials, and/or participating, you may submit comments in several ways:

  • During the virtual meeting or in-person meeting
  • Email the FDOT Project Manager Pete Winkler at peter.winkler@dot.state.fl.us
  • Mail comments to FDOT District 2 Office at 1109 South Marion Avenue, MS 2007, Lake City, Florida 32025

While comments about the project are accepted at any time, please note that comments must be received by June 28, 2024 to be included in the official meeting record. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. People who require special accommodations under the Americans with Disabilities Act or who require translation services (free of charge) should contact Brie Isom at brie.isom@dot.state.fl.us or (904) 831-3368 at least seven days prior to the meeting.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated May 26, 2022, and executed by the Federal Highway Administration and FDOT.

Project Details
Project Start:Summer 2025
Expected Completion:Spring 2026
Cost:$11 million
Project #:210269-4
RoadsState Road 5, U.S. 1, State Road 207, State Road 312
CountiesSt. Johns
CitiesSt. Augustine
Contact
Photo of Brie IsomBrie Isom
904-360-5457
U.S. 1 from Moultrie Creek to North of State Road 207 resurfacing
Overview

Halifax Paving, Inc. was selected to complete this project which consists of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb and gutter work, traffic signal installation, highway signing installation, sidewalk and bicycle path work, and other incidental construction.

Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 7 a.m. to 7:30 p.m. Monday through Sunday. No lane closures will be allowed from 6:30 a.m. to 9 p.m. within 600 feet of a signalized intersection Monday through Sunday.

Project Details
Project Start:Summer 2025
Expected Completion:Spring 2026
Cost:$11 million
Project #:210269-4
RoadsState Road 5, U.S. 1, State Road 207, State Road 312
CountiesSt. Johns
CitiesSt. Augustine
Contact
Photo of Brie IsomBrie Isom
904-360-5457
Events
Subsequent Access Management Hybrid Public Meeting (Thursday, January 9, 2025)

Virtual Construction Open House and Public Meeting

A virtual construction open house and public meeting will be held on Thursday, January 9, 2025. Staff and consultants will be available from 4:30 p.m. to 6:00 p.m. (Eastern Time) to answer questions and accept comments related to the proposed improvements. A formal presentation and public comment period will begin at 6:00 p.m.

Virtual Meeting Registration: Register via GoTo Webinar

In-Person Construction Open House and Public Meeting

An in-person construction open house and public meeting will also be held on Thursday, January 9, 2025, at the St. Johns County Public Library Main Branch, located at 1960 N. Ponce De Leon Blvd., St. Augustine, FL 32084. Staff and consultants will be available from 4:00 p.m. to 6:00 p.m. (Eastern Time) to answer questions and accept comments related to the proposed improvements. A formal presentation and public comment period will begin at 6:00 p.m.

In-person and Virtual Public Meeting (Thursday, June 20, 2024)

The Florida Department of Transportation (FDOT) District Two invites you to the Public Meeting to provide input on the proposed median modification at U.S. 1 and Marion Street. The purpose of this meeting is to inform the public of the proposed median modification and provide an opportunity for the public to provide feedback. There are multiple opportunities to participate in the project feedback, including a virtual/online option and an in-person option. All participants, regardless of the platform they choose, will receive the same information on the proposed project and all comments received in-person, virtually or electronically, will be given equal weight.

Meeting Location:
St. Johns County Public Library System Main Branch Library
1960 N Ponce De Leon Boulevard, St. Augustine, FL.

Open House: 4:30 p.m. to 6 p.m.
Presentation and Public Comment Period: 6 p.m.
Virtual Registration: https://register.gotowebinar.com/register/4157009811792784728

After reviewing the meeting materials, and/or participating, you may submit comments in several ways:

  • During the virtual meeting or in-person meeting
  • Email the FDOT Project Manager Pete Winkler at peter.winkler@dot.state.fl.us
  • Mail comments to FDOT District 2 Office at 1109 South Marion Avenue, MS 2007, Lake City, Florida 32025

While comments about the project are accepted at any time, please note that comments must be received by June 28, 2024 to be included in the official meeting record. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. People who require special accommodations under the Americans with Disabilities Act or who require translation services (free of charge) should contact Brie Isom at brie.isom@dot.state.fl.us or (904) 831-3368 at least seven days prior to the meeting.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated May 26, 2022, and executed by the Federal Highway Administration and FDOT.

 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable