NW 34th Boulevard (State Road 121) resurfacing and safety improvements
Overview

The NW 34th Boulevard (State Road 121) Resurfacing project is a resurfacing/safety improvements projects that will add Two-Way Inside Left (TWIL) turn lanes at prescribed areas. TWILs are provided to remove left-turning vehicles from the through lanes and store those vehicles in the median area until an acceptable gap in opposing traffic is available.

TWIL turn lanes are being installed in the following locations:

* Between NW 16th Avenue and NW 39th Avenue

* Between NW 39th Avenue to NW 53rd Avenue

* Between NW 53rd Avenue to U.S. 441

Other items of improvement include: shoulder treatment (drop-off correction), drainage improvements to accommodate roadway widening areas, Intelligent Transportation System (ITS) upgrades and signals upgrades such as the installation of flashing beacons at schools and traffic awareness indicators at NW 16th Avenue.

FDOT selected R.E. Arnold Construction to complete this project in summer 2022, weather and unforeseen circumstances permitting.

Traffic Impacts
Project Photos
No photos at this time.
Project Documents
No documents at this time.
No Events at this time.
Project Details
Project Start:Fall 2020
Expected Completion:Summer 2022
Cost:$5.6 million
Project #:439490-1
RoadsState Road 121
CountiesAlachua
CitiesGainesville
Contact
Photo of Daryl GossDaryl Goss
386-984-5392
NW 34th Boulevard (State Road 121) resurfacing and safety improvements
Overview

The NW 34th Boulevard (State Road 121) Resurfacing project is a resurfacing/safety improvements projects that will add Two-Way Inside Left (TWIL) turn lanes at prescribed areas. TWILs are provided to remove left-turning vehicles from the through lanes and store those vehicles in the median area until an acceptable gap in opposing traffic is available.

TWIL turn lanes are being installed in the following locations:

* Between NW 16th Avenue and NW 39th Avenue

* Between NW 39th Avenue to NW 53rd Avenue

* Between NW 53rd Avenue to U.S. 441

Other items of improvement include: shoulder treatment (drop-off correction), drainage improvements to accommodate roadway widening areas, Intelligent Transportation System (ITS) upgrades and signals upgrades such as the installation of flashing beacons at schools and traffic awareness indicators at NW 16th Avenue.

FDOT selected R.E. Arnold Construction to complete this project in summer 2022, weather and unforeseen circumstances permitting.

Project Details
Project Start:Fall 2020
Expected Completion:Summer 2022
Cost:$5.6 million
Project #:439490-1
RoadsState Road 121
CountiesAlachua
CitiesGainesville
Contact
Photo of Daryl GossDaryl Goss
386-984-5392
 
Link to FDOT's Facebook page (opens new browser window) Link to FDOT's Twitter page (opens new browser window) Link to FDOT's YouTube page (opens new browser window) Link to FDOT's Wordpress page (opens new browser window) Link to FDOT's Multimedia page (opens new browser window) Link to FDOT's RSS page (opens new browser window)

Florida Department of Transportation

Consistent, Predictable, Repeatable